The WS Development project in Millbury, Massachusetts, involved the installation of electrical infrastructure to support a new high-speed electric vehicle charging area. The project included the electrical work required to power six Level 3 EV charging stations, providing charging access while establishing the infrastructure needed for safe and reliable operation.
The scope of work included installing conduit and cabling between the utility transformer, electrical distribution cabinet, and charging stations. A new distribution cabinet and circuit breakers were installed to support the charging equipment, which was supplied by others. The project also included the installation of protective bollards around the utility transformer, distribution cabinet, and charging stations to help safeguard critical electrical infrastructure from vehicle impact.
Additional site work included the installation of a concrete pad and fencing for the electrical distribution equipment and three power towers. These improvements helped organize and protect the electrical infrastructure while supporting the functional requirements of the charging installation.
The project was supported by a $372,000 National Grid incentive, helping offset the investment in EV charging infrastructure. By combining electrical distribution upgrades, protective equipment, and site infrastructure, the project established the foundation for high-speed EV charging at the Millbury development.
Project specifics
Location
Millbury, Massachusetts
Customer
WS Development
Project Type
Electric Vehicle (EV) Charging Infrastructure Installation
EV Upgrades
Installation of six Level 3 EV charging stations with six charging ports
Utility Incentive
$372,000 National Grid incentive
Services
Electrical infrastructure installation, conduit and cabling, distribution cabinet installation, circuit breakers, protective bollards, concrete pad installation, and fencing