Wentworth Buildings · Boston, Massachusetts · Energy Efficiency
CET Energy Solutions completed a lighting retrofit project across the Wentworth Buildings in Boston, Massachusetts, focused on reducing electricity consumption and improving lighting efficiency. The project involved upgrading approximately 600 existing fixtures to improve building performance and deliver long-term energy savings.
As part of the project, CET Energy Solutions coordinated the lighting replacements along with the necessary patching and painting associated with the fixture upgrades. This comprehensive approach helped ensure that the work addressed both the functional requirements of the lighting improvements and the condition of the surrounding spaces.
The completed upgrades are expected to deliver significant energy savings, reducing electricity consumption by approximately 832,244 kWh. By modernizing the building lighting systems, the project helps lower operating costs, improve lighting performance, and reduce the buildings’ overall energy use.
This project demonstrates CET Energy Solutions’ commitment to delivering practical energy-efficiency improvements that combine measurable energy savings with quality installation and attention to the finished environment.
Project specifics
Location
Boston, Massachusetts
Customer
Wentworth Buildings
Project Type
Lighting Retrofit and Energy Efficiency Upgrades
Lighting Upgrades
Energy-efficient lighting replacement for approximately 600 fixtures
Annual Energy Savings
832,244 kWh
Services
Lighting retrofits, fixture replacement, and associated patching and painting